MASTER OPERATIONAL ARCHITECTURE • 5 Regions • 29 Business Hubs • 4 Funding Schemes

End-to-End Meter & Store Management System

A unified closed-loop platform uniting Track A (Store & Materials Procurement), Track B (MAP Customer Lifecycle — Paid), Track B2 (Rollout / DISREP Feeder Mass Deployment — Free), Track C (Security Seals & TID Rollover), Track D (3-Tier Quality Certification & Billing), and Track E (Revised NSTS Prepayment Replacement V2 SOP).

Track A • Supply
Store & AOC

Contracts → GRN → Vocab

Contracts: 0
Track B • Revised MAP
MAP (5 Layers)

Buffer → Form 74 → Pay → Escrow

Cust: 467 Buffer: 0
Track B2 • Rollout
DISREP (Free)

Feeder → Alloc → Install

Free: 5 • Progs: 9
Track C • Seals
Security Seals

Custody → Break → TID

Seals: 1,500
Track D • Quality
3-Tier Cert

MSO → RPU → QA → ECMI

QA Pass: 0 • Vended: 0
Track E • SOP V2
NSTS Replacement

Collate → KYC → Expunge

Collated: 2 Credited: 0
Live Real-Time Enterprise Operational Metrics
0
Contracts (AOC)
0
Goods Received (GRN)
0
4-Tier Certified OK
10
Vocab Stock Codes
931
Meters In Store
0
SRIN Requisitions
0
SRCN Transfers
0
Store Credit Notes
467
MAP Customers (Paid)
0
Buffer Tested OK
0
Form 74 Issued
0
CCU Eval Redirects
0
Debt Concurrences
0
BHM Debt Referrals
5
Rollout Customers (Free)
428
Tech Evals Passed
271
Payments Confirmed
91
Installed Meters
0
Old Meters Recovered
0
RPA Custody Accepted
0
Escrow Recommendations
0
RA Sanctions Escalated
0
Billing Profiled Active
0
NERC Reports Compiled
0
QA Certified
1,500
Security Seals
2
NSTS Cases Collated
0
NSTS Validated KYC
0
NSTS Installed & Tagged
0
NSTS Credited 1:1
Unified 6-Track Operational Process Architecture
Live Visual SOP Map
flowchart TD %% Styling Classes classDef trackA fill:#1e3a8a,stroke:#3b82f6,stroke-width:2px,color:#fff; classDef trackB fill:#c25e00,stroke:#fc8002,stroke-width:2px,color:#fff; classDef trackB2 fill:#065f46,stroke:#10b981,stroke-width:2px,color:#fff; classDef trackC fill:#4c1d95,stroke:#8b5cf6,stroke-width:2px,color:#fff; classDef trackD fill:#0e7490,stroke:#06b6d4,stroke-width:2px,color:#fff; classDef trackE fill:#0284c7,stroke:#38bdf8,stroke-width:2px,color:#fff; classDef gate fill:#991b1b,stroke:#ef4444,stroke-width:2px,color:#fff; subgraph TRACK_A ["TRACK A: Store Management & Procurement"] AOC["1. Award of Contract (AOC)
• Schedule A Bill of Quantities
• Pricing & 7.5% VAT
• Signed Contract PDF Upload"]:::trackA AOC --> TAT["Contractor Ack & Delivery SLA"]:::trackA TAT --> GRN["2. Goods Received Note (GRN)
• Waybill Idempotency Safeguard
• Partial & Complete Intake
• Notify Inspection Staff Roster"]:::trackA GRN --> InspCert["3. 4-Tier Certificate of Inspection
• 1. Technical User Sign-off
• 2. Internal Audit Vetting
• 3. Materials Mgmt Sign-off
• 4. Procurement Sign-off
• Digital Signature Uploads"]:::trackA InspCert --> Vocab["4. Vocab Stock Catalog
• 8-Digit Standard Vocab Numbering
• 7-Column CSV Bulk Import
• Duplicate Stock Code Merge Tool"]:::trackA Vocab --> MasterStore[("Master Store Inventory Ledger
• HQ Central Store
• Regional Warehouses
• Business Hub Stores")]:::trackA MasterStore --> SRIN["5. SRIN: Intra-Store Requisition
• MMO Review & Decline Reasons
• BHM Concurrence
• Audit Vetting & Multi-Assist
• 6-Digit OTP Token Counter Handshake"]:::trackA MasterStore --> SRCN["6. SRCN: Inter-Store Transfers
• Route Distance & Fuel Engine
• 7-Tier Approval Chain
• Dispatch Vehicle Manifest"]:::trackA MasterStore --> CreditNote["7. Store Credit Notes
• Surplus/Defective Returns
• HQ Lead MMO Authorization
• OTP Intake Receipt"]:::trackA end subgraph TRACK_B ["TRACK B: Revised MAP Implementation Process Flow (SOP 31/05/2024 - 5 Layers)"] Buffer["1. Central Store Buffer Intake
• Monthly Restock Triggers"]:::trackB Test{"2. 3-Point Pre-Commissioning
• Accessories, Power, KCT/SGC"}:::gate Buffer --> Test Test -- Passed --> PreProg["3. Pre-Programming & AMI Config
• Vending-Ready Deployment"]:::trackB PreProg --> AppEntry["4. Walk-in / Online MAP Portal"]:::trackB AppEntry --> CustType{"Customer Type?"}:::gate CustType -- New/Potential --> Form74["5. Administer Form 74
• New Set-Up Account Generation"]:::trackB CustType -- Existing --> MapForm["6. Administer MAP Form
• Scheme / Replacement Choice"]:::trackB Form74 --> TechEval{"7. Technical Evaluation (2-Days)
• Joint MSO & MAP Premises Visit
• MSMS Safety Checklist"}:::gate MapForm --> TechEval TechEval -- Failed --> CCURedirect["Redirect to Customer Care (CCU)
for Explanation & Rectification"]:::gate CCURedirect --> TechEval TechEval -- Passed --> DebtAnalysis["8. Billing Debt Analysis
• Indebtedness & Bypass Check"]:::trackB DebtAnalysis --> DebtNeg{"9. Debt Negotiation
• Terms Concurrence"}:::gate DebtNeg -- Agreed --> SelectOffer["10. Monthly NERC MAP Vendor & Type"]:::trackB DebtNeg -- Disagreed --> BHMReferral["Refer to Business Manager (BHM)
for Ownership & Negotiation"]:::gate BHMReferral --> DebtNeg SelectOffer --> StockGate{"Meters in Stock?"}:::gate StockGate -- No --> StockLock["Hard-Block Payment on Meter Type
• Low-Stock Notification to MAP"]:::gate StockGate -- Yes --> MAPPay["11. Payment via MAP ID
• F&A Aggregator Reconciliation"]:::trackB MAPPay --> AMIAlloc["12. AMI Serial Allocation"]:::trackB AMIAlloc --> TriNotify["13. Tri-Party Install Notification
• MAP, HM, and OC Notified"]:::trackB TriNotify --> OldRecovery["14. Old Meter Recovery
• Credited to IBEDC Store
• RPA Inventory Intake Custody"]:::trackB TriNotify --> MobileApp["15. Field Installation & Mobile App Upload
• Automatic Pre-Programming"]:::trackB MobileApp --> IBEDCPayVend["16. IBEDCPay First Vend Validation
• Initial Energy Credit Vend"]:::trackB IBEDCPayVend --> EscrowPayout["17. Escrow Vendor Payout
• Metering Recommendation
• F&A Disburses from Escrow"]:::trackB MobileApp --> MSOCert["18. MSO Certification & Sealing (10-Days)"]:::trackB MSOCert --> RACert{"19. 100% RA 2nd-Level Verification
• Anti-Theft & NESI Standards"}:::gate RACert -- Non-Compliant --> SanctionEscalate["Escalate to HM & OC
for Sanctions against MSO"]:::gate RACert -- Passed --> AuditRisk["20. Audit Risk Assessment
• Recovered Meter Risk Audit"]:::trackB AuditRisk --> Layer4Profile["21. Layer 4: Billing Customer Profiling"]:::trackB Layer4Profile --> Layer5NERC["22. Layer 5: Monthly NERC Regulatory Report"]:::trackB end subgraph TRACK_B2 ["TRACK B2: Rollout / DISREP Mass Deployment (100% Free)"] FeederTarget["1. Feeder & DT Cluster Targeting
• Distribution Substation (DSS) Profiling
• Unmetered Premises Enumeration"]:::trackB2 FeederTarget --> RolloutKYC["2. Fast-Track Technical KYC
• Feeder Door-to-Door Audit
• GPS Coordinates & Earthing Check"]:::trackB2 RolloutKYC --> FreeAlloc["3. Free Direct AMI Allocation
• Zero Payment & Zero Debt Gate
• CAPEX / DISREP Grant Funded
• Automated Serial Reservation"]:::trackB2 FreeAlloc --> TurnkeyDispatch["4. Turnkey Contractor Dispatch
• Bulk Work Order Assignment
• Logistics Handover"]:::trackB2 TurnkeyDispatch --> MassInstall["5. Feeder Mass Field Installation
• Street-by-Street Sweep
• Apply Security Seal Barcode
• Geotagged Install Photos"]:::trackB2 end subgraph TRACK_C ["TRACK C: Security Seals & Custody"] SealIntake["1. Vendor Seal Intake (GRN)"]:::trackC SealIntake --> SealIssue["2. Issue Seals to Field Officer Custody"]:::trackC SealIssue --> SealApply["3. Apply Seal to Meter (Side-by-Side Proof)"]:::trackC SealApply --> BreakReplace["4. Break & Replace Protocol
• Pre-Verification Gate
• Before Photo Proof
• 2-Day Return SLA"]:::trackC BreakReplace --> PublicVerify["5. Public QR Seal Certificate"]:::trackC BreakReplace --> TamperReg["6. Tamper & Theft Register"]:::trackC TID_Rollover["7. STS TID Rollover (KCT 1 & 2)"]:::trackC end subgraph TRACK_D ["TRACK D: Quality Assurance & Billing"] CertMSO["1. MSO 1st-Level Certification
• Workmanship & Sealing Verification"]:::trackD CertMSO --> CertRPU["2. RPU 2nd-Level Verification
• Anti-Tamper & Anti-Bypass Check"]:::trackD CertRPU --> CertQA["3. Final Quality Assurance (QA)
• Compliance Approval Gate"]:::trackD CertQA --> ECMISync["4. ECMI Billing Programming
• Account Sync & Startup Token Preload"]:::trackD ECMISync --> InitialVend["5. Initial Energy Credit Vend
• 60-Day Energization SLA Monitor"]:::trackD InitialVend --> Lifeline360[("360° Meter Asset Lifeline Trace
• IntelTrak AI Risk Engine")]:::trackD end subgraph TRACK_E ["TRACK E: Revised NSTS Prepayment Replacement Process V2"] NSTS_Store["1. Store Delivery & Pre-Commissioning
• Accessories Complete
• Powers On When Energized
• KCT & SGC Compliant"]:::trackE NSTS_Store --> NSTS_L1Collate["2. Layer 1: List Collation & Clean
• BHMs & Walk-in Cash Office
• Loss Reduction, Audit, Metering
• SSP Deduplication & Collation"]:::trackE NSTS_L1Collate --> NSTS_L1Val{"3. KYC Validation Routing
• BHM Lists → Business Hubs
• Others → Loss Reduction"}:::trackE NSTS_L1Val -- Validated --> NSTS_L1Desk["4. DeskStream Postpaid Check
• SSP Concurrence Gate
• Express Account Creation
• Express Account Reactivation"]:::trackE NSTS_L1Val -- Failed --> NSTS_L1Reject["Correct or Remove Record"]:::gate NSTS_L1Reject --> NSTS_L1Collate NSTS_L1Desk --> NSTS_L2Upload["5. Layer 2: MSMS Ingestion
• Metering Team Validated Upload"]:::trackE NSTS_L2Upload --> NSTS_L2AMI["6. AMI Meter Manifest Allocation"]:::trackE NSTS_L2AMI --> NSTS_L2HSE["7. Mandatory HSE Safety Induction
• HSE Team Certifies Installers"]:::trackE NSTS_L2HSE --> NSTS_L2Install["8. Dual-Meter Field Installation
• Old Meter Details & Geotagged Photo
• Bold Serial Tagging on Old Meter
• New STS Meter Serial & Seal Barcode
• Post-Install Billing Programming"]:::trackE NSTS_L2Install --> NSTS_L2Return["9. 1:1 Handover & Inventory Credit
• Vendor Returns Old Meter to Metering
• Loss Reduction KYC Reconciliation
• 1:1 Store Inventory Credit
• SSP Team Notification"]:::trackE NSTS_L2Return --> NSTS_Destruction["10. Disposal Committee & Asset Expunge
• Disposal Committee Schedule
• IBEDC Disposal Policy Destruction
• MMO Notifies Finance
• Finance Expunges Asset Register"]:::trackE end MasterStore --> Buffer MasterStore --> FreeAlloc OldRecovery --> CreditNote SealApply --> MobileApp SealApply --> MassInstall MobileApp --> CertMSO MassInstall --> CertMSO MasterStore --> NSTS_Store

Full statutory supply chain governance covering Award of Contract (AOC) & Schedule A Bill of Quantities, Goods Received Notes (GRN) with waybill idempotency, 4-Tier Certificate of Inspection for Goods, Standard Vocab Numbering, Intra/Inter-Hub Requisitions (SRIN/SRCN), Store Returns (Credit Notes), and Chief Commercial Officer (CCO) Exceptional Approvals.

1
Award of Contract (AOC) & Itemized Schedule A Ingestion

Procurement enters contract details, contractor data, delivery period SLA, and builds the itemized Schedule A line item table with technical specifications, unit prices, and automatic 7.5% VAT calculation. Includes Signed Contract PDF upload and official voucher printout.

Procurement & Supply Chain Open in app Official Printout
2
Contractor Acknowledgment & Delivery SLA TAT Tracking

Contractor acknowledges acceptance of contract terms. The system activates the delivery countdown and tracks Turnaround Time (TAT) to ensure on-time material arrival.

Supply Chain & Contractor Open in app
3
Physical Delivery Intake & Idempotent GRN Generation

When materials arrive at HQ Store, the store officer cross-matches quantities against Schedule A items. Supports partial delivery (awaiting complete) and full 100% delivery. Enforces Waybill Idempotency (rejects duplicate waybills) and notifies the Divisional Staff Roster for inspection.

HQ Store Officer (MMO) Open in app Official Printout
4
4-Tier Statutory Certificate of Inspection for Goods

The official Stock Certification Team inspects delivered materials against IBEDC technical standards. Requires 4 mandatory digital sign-offs: ① Technical / User, ② Internal Audit Vetting, ③ Materials Management, and ④ Procurement & Inventory, with Digital Signature Uploads rendered on printouts.

Stock Certification Team (4 Tiers) Open in app Official Printout
5
Vocab Stock Code Numbering & Inventory Crediting

HQ Store assigns certified materials to standard 8-digit Vocab Numbers (e.g. 005-00062 Feeder Pillar Fuse, 001-00089 Line Tap). Features 7-column CSV bulk import and an intelligent Duplicate Stock Code Merge Tool.

Materials Management (MMO) Open in app
6
SRIN: Intra-Store Requisition with 6-Digit OTP Handshake

User department requests materials from local Hub store. Chain: Request → Local MMO Review (with system decline reasons & routing) → Business Hub Manager Approval → Regional Auditor Vetting (with collaborative multi-auditor assist invites). Release is unlocked via a 6-Digit OTP Token.

User Department → MMO → BHM → Auditor Open in app Official Printout
7
SRCN: Inter-Store Transfer with Distance & Freight Optimization

When a Hub requires stock from another store, the Route Heuristic Engine computes distance (km), fuel expenditure (₦1,200/L), and logistics handling to recommend transfer vs. local purchase. Concurrence chain: Origin BHM → Origin RH → Source BHM → Source RH → Dept Head → HQ Audit → Div Head → Vehicle Manifest.

MMO → Regional Heads → Audit → Chief Open in app Official Printout
8
Credit Notes: Surplus & Salvaged Material Store Returns

Departments and MMOs return unused, surplus, or recovered items to the warehouse. Requires reason logging and Lead MMO at HQ Store authorization. Token receipt verifies physical handover and automatically credits receiving store inventory.

Returning Officer → Lead MMO Open in app Official Printout
9
Track A MSO Quota Gate & CCO Exceptional Approvals

When issuing meters to MSOs for customer installation, the system verifies outstanding uninstalled field balances. If an MSO holds ≥ 10 uninstalled meters, new issuance is locked. Officers can request a Chief Commercial Officer (CCO) Exceptional Approval to override limits.

MMO → Chief Commercial Officer (CCO) Open in app
10
Closed-Loop Field Installation & Master Ledger Balancing

MSO installs meters on customer premises with GPS coordinates and security seal application. Confirmation dynamically decrements field custody, updates Hub sample dashboards, and reconciles the central HQ asset pool in real-time.

Field Installer / MSO → Billing Open in app
TRACK B • REVISED SOP

MAP Implementation Process Flow — 5-Layer Closed-Loop Governance

The updated, regulatory-governed 5-Layer MAP lifecycle in accordance with the Revised MAP Implementation Process Flow (31/05/2024). Incorporates central store buffer restocking, 3-point pre-commissioning, Form 74 new set-up account routing, 2-day technical evaluation with Customer Care fail redirects, billing debt analysis with BHM referral gates, monthly vendor & out-of-stock payment blocks, tri-party installation notices (MAP, HM, OC), old meter recovery credited to store & RPA inventory intake, IBEDCPay first vend validation, escrow recommendations, 100% RA second-level certification with MSO sanction escalations, audit risk assessment, customer profiling, and monthly NERC reporting.

1
Prerequisite: Central Store Buffer Delivery & Monthly Restocking Triggers

MAPs deliver predetermined buffer meter quotas to each central store (tailored by geography). When buffer meters hit the reorder threshold, an automated trigger notification is dispatched to MAPs for monthly restocking.

MAP Vendors → Store MMO & Head of Metering Open in app
2
Prerequisite: 3-Point Pre-Commissioning Tests & AMI Pre-Programming

Metering Operations conducts mandatory 3-point pre-commissioning checks: ① All accessories complete, ② Powers ON when energized, and ③ KCT & SGC compliant. Asset Protection, Audit, Billing Ops & AMI Team pre-program meters to be vending-ready before deployment.

Metering Operations (MO), Audit, Billing & AMI Open in app
3
Layer 1: Customer Application & Form 74 Administration (New Set-Up Routing)

Customers apply via MSMS portal or walk-in. Customer Care administers forms: For New / Potential Customers, Form 74 alongside MAP Form is administered → triggers New Set-Up Internal Processes to generate a customer account number. Existing customers receive the MAP Form directly.

Customer Care Unit (CCU) → Frontline Staff Open in app Linked Module
4
Layer 1: Joint Technical Evaluation (2-Days SLA) & Customer Care Redirect Gate

MSO in conjunction with MAP designate visits premises within 2 days to evaluate suitability against the MSMS checklist. Hard Gate: If evaluation fails, customer is automatically redirected to Customer Care for explanation and physical rectification before re-evaluation.

MSO & MAP Designate → Customer Care (CCU) Open in app Linked Module
5
Layer 1: Billing Debt Analysis, Negotiation & Business Manager (BHM) Referral Gate

Billing conducts account debt analysis (bypasses, suspended accounts, level of indebtedness). Repayment terms are shared with the customer by CCU. Hard Gate: If customer agrees, cleared for payment. If customer disputes terms, case is referred to Business Manager (BHM) for ownership and further negotiation.

Billing Operations → CCU → Business Manager (BHM) Open in app Linked Module
6
Layer 2: Monthly NERC MAP Vendor Selection & Out-of-Stock Payment Gate

Customer logs in with MAP ID and selects from the list of NERC-approved MAP vendors available for the month, then selects the registered meter type. Hard Gate: If the selected meter type is out of stock, system prevents payment and sends a low-stock alert to the vendor.

Customer → Frontline Staff Open in app
7
Layer 2: Payment via MAP ID, F&A Aggregator Reconciliation & AMI Allocation

Customer completes payment using MAP ID via Flutterwave. Finance & Accounts (F&A) verifies and reconciles with Payment Aggregators and notifies MAP. AMI team allocates the reserved meter serial to customer profile.

Finance & Accounts (F&A) → AMI Team Open in app Linked Module
8
Layer 3: Supervisory Assignment Hub & Live Auto-Decrementing Field Worklist

Upon store issue, MSO Leads / Supervisors assign collected meters to profiled field installers (structured across Region → Business Hub → Service Centre → Vendor). The assigned worklist auto-decrements toward zero in real-time via smart AJAX sync as field installations are completed.

Supervisors → Profiled Installers Open in app Linked Module
9
Layer 3: Field Installation Upload, MSMS Seal Attachment & IBEDCPay First Vend

Installer uploads completed installation with site photos and GPS coordinates via the mobile app or web portal. Attaches tamper-evident MSMS security seal. System pushes data to IBEDCPay and customer conducts first vend to validate meter operation.

Field Installer → IT Systems → Customer (IBEDCPay) Open in app Linked Module
10
Layer 3: Escrow Monitoring & Metering Payment Recommendation to F&A

Metering Operations continuously monitors metered customer volumes and submits formal payment recommendations to F&A based on accumulated balances in the escrow account. F&A reviews recommendations and disburses payments to the respective MAP vendor.

Metering Operations (MO) → Finance & Accounts (F&A) Open in app
11
Layer 3: 10-Day MSO Certification & 100% RA 2nd-Level Sanctions Escalation

MSO inspects installation and applies tamper-evident seal within 10 days. Revenue Assurance (RA) conducts 100% second-level certification against theft, bypass, and NESI standards. Hard Sanction Gate: Any exception is escalated immediately to HM and OC for formal sanctions against the responsible MSO.

MSO → Revenue Assurance (RA) → HM & OC Open in app Linked Module
12
Layers 4 & 5: Audit Risk Assessment, Customer Profiling & Monthly NERC Report

Internal Audit conducts second-level physical risk assessment on recovered meters and inventory compliance. Billing Operations updates customer master data and activates the account (Layer 4). Regulatory Affairs and Metering Operations compile and submit the statutory monthly implementation report to NERC (Layer 5).

Internal Audit, Billing Ops → Regulatory Affairs Open in app Linked Module
13
Final Process: Closed-Loop Customer Experience Sign-Off & Turnaround Time Audit (10-Day SLA)

Meter programming is NOT the last process — customer handover sign-off is! Customers rate their whole meter installation journey (Application ease, Turnaround Time vs 10-day NERC SLA, Wiring neatness, Installer conduct, Power energization verification, CIU keypad handover, and Zero-tolerance extortion check). Low ratings or extortion reports instantly trigger Internal Audit escalation.

Customer (Portal & 1-Click SMS/Email) → CCU → Audit Open in app Linked Module
TRACK B2

Rollout (DISREP / NMMP) — 100% Free Feeder Mass Deployment